Best Non Gamstop Casinos UK
VAM logo
Publications
Training & Education
Reference Materials
Proficiency Testing
Vam Programme
Sector Networks
Surveys
Links

Site Map
Registration


Go!

HomepageAbout VAMAdvice & InfoLatest NewsCommunitiesContact Us

< back     Publications | Publications Search | Publication: VAM Item  

Controlling Uncertainties in Extraction and Recovery and Controlling Matrix Effects: Interim Report. Part 1: Consultation, Summary and Recommendations

Date: 31/03/2002 Ref No: LGC/VAM/2002/016 Type: Report
Author(s): Ellison SLRE
Organisation/Publisher: LGC

This report forms a joint Interim Report required under VAM projects MU1 (Controlling Matrix Effects) and MU3 (Controlling Uncertainties in Extraction and Recovery) under Milestones MU1/e and MU3/c. The report is in three parts. Part 2 describes of experimental studies to date. A full literature review is provided in Part 3. Part 1 provides the results of end user consultations, summaries of parts 2 and 3, and considers the need for, and direction of, future technical work within the two projects. In Part 1, the principal findings are presented and recommendations are made on the direction of technical work within the two projects.

 Contents:
Publications
Overview
Search Publications
Show Basket
 DownLoad Article:
Please log in or register to download this publication

Price: £0.00 Please log in or register to download this publication
Email this page to a friend >

Homepage | About VAM | Latest News | Communities | Advice & Information | Contact Us
Privacy Statement | Publications | Training & Education | Reference Materials | Proficiency Testing
Bio-Measurement | Links | Site Map | Registration | Terms Of Use

The VAM Web site has been developed by LGC under contract with the UK Department of Trade and Industry as part of the National Measurement System's Valid Analytical Measurement programme.

©2001 LGC Limited.
All trademarks acknowledged. All rights reserved.
Website design by redweb Limited

Additional resources